Mine Construction, Mining of Mineral Deposits

Life of Mine Plans and Annual Mining Plans for Extraction and Primary Processing of Natural Resources

Advancing the mining front line in the period 2016-2021 at the Mines of Mini Maritsa Iztok EAD

Life of Mine Plan and Annual Mining Plans for concurrent mining of the Asarel deposit and Asarel–West Section deposit – alternative options

Integrated engineering design for the development of Zlatna Panega quarry in the period 2017-2032 within the quarrying lease, and a comprehensive rehabilitation project

Preliminary, Technical and Detailed Designs for Construction, Operation, Closure and Rehabilitation of Mining Waste Sites and Facilities

Advancing the mining front line in the period 2016-2021 at the Mines of Mini Maritsa Iztok EAD

Conveying and disposal of ash and gypsum from AES-3C Maritsa East 1 TPP. Industrial site; Infrastructure; Mining Waste Facility and transport

Conveying and disposal of ash and gypsum from AES-3C Maritsa East 1 TPP. Industrial site; Infrastructure; Mining Waste Facility and transport

Gypsum dump area for disposal of gypsum from the FGD (Flue Gas Desulphurization) Plants at TPP Maritsa East 2

Designation of an additional area for the expansion of the Staroselets dump area, and dumping technology conducive to better conditions for subsequent rehabilitation

Technical rehabilitation to allow for agricultural use of the Mednikarovo offsite dump area at Troyanovo 3 Mine.

Projects for Putting Mine Sites Under Care and Maintenance, or for Decommissioning of Mine Sites

Project for the abandoning of the concession license area, decommissioning, rehabilitation, Mini Maritsa Iztok

Detailed designs for the decommissioning of the Lukina Padina prospect and of the main openings at Ptichi Dol – Velin Dol prospect of the Lukina Padina deposit

Detailed design for the abandoning of the Babino mining area – underground section, and detailed desing for the abandoning of the Bobov Dol mining area – underground section, Bobovdol Coal Basin

Rehabilitation Projects

Project for the abandoning of the concession license area, decommissioning, rehabilitation, Mini Maritsa Iztok

Pilot-scale testing of technologies for humus-free rehabilitation of disturbed lands in the area of Mini Maritsa Iztok

Biological rehabilitation of the Staroselets offsite dump area at Troyanovo 1 Mine