Customers
Among the Minproekt’s customers are leading mining and energy companies, and mining consulting companies.
AMEC FOSTER WHEELER
Krumovgrad Gold Project – design and supply of a process plant
Design of a pyrite recovery production line at Chelopech Mining EAD
Engineering and consulting services for the Krumovgrad Gold Project – Mining and Processing of Gold Ores from Ada Tepe Prospect of Khan Krum Deposit.
ASAREL-MEDET
Life of Mine Plan and Annual Mining Plans for concurrent mining of the Asarel deposit and Asarel–West Section deposit – alternative options
Cyclic-Flow Line (CFL) 3 for ore crushing and conveying from the Asarel Mine to the Primary Crushing section of the Process Plant, with maximum use of the CFL 1 for overburden conveying, and a throughput of 3000 t/h
Conveying the clean waters of the Panova River by constructing protective canals and adjustment of the alignment of the potable water supply pipeline between the Panova River and the village of Obrochishte.
AURUBIS BULGARIA
Off-gases treatment plant
Enclosed conveyor belt system for concentrate
Concentrate loadout area
BULGARIA FLUORITE LTD.
BALGARSKA ENERGETIKA
BOBOV DOL COAL MINING LTD.
Detailed designs for the decommissioning of the Lukina Padina prospect and of the main openings at Ptichi Dol – Velin Dol prospect of the Lukina Padina deposit.
Detailed design for the technical and biological rehabilitation of industrial sites and dumps at Lukina Padina prospect.
Geological report on the remaining fluorite ore resources after the completion of the underground decommissioning of the Lukina Padina prospect.
Design, fabrication, supply, assembly and commissioning of SRs2000 & SRs200 Bucket Wheel Excavators at Mini Maritsa Iztok EAD.
Detailed design for the abandoning of the Babino mining area – underground section, and detailed desing for the abandoning of the Bobov Dol mining area – underground section, Bobovdol Coal Basin.
COAL PERNIK Ltd
ENGINEERING DOBERSEK GmbH
DUNDEE PRECIOUS METALS KRUMOVGRAD EAD
Annual Mining Plan for coal mining from the Bela Voda Mine
Upgrading of the Cooling Pumping Station (CPS-1) at Maritsa East 2 TPP
Engineering and consulting services for the Krumovgrad Gold Project – Mining and Processing of Gold Ores from Ada Tepe Prospect of Khan Krum Deposit
DUNDEE PRECIOUS METALS CHELOPECH EAD
Investigating logistics management and preparing a detailed design for a concentrate handling system for Area 18 – Concentrate Handling Project
Upgrade and expansion of the underground power supply system in the Chelopech Mine
Preliminary and detailed civil/structural design for repairs to the load-bearing structure of the Process Plant building.
AES
Preliminary and detailed civil/structural design for repairs to the load-bearing structure of the Process Plant building.
Desing for conveying and disposal of ash and gypsum from AES-3C Maritsa East 1 TPP. Industrial site; Infrastructure; Mining Waste Facility and transport
Dryanovo Ash and Gypsum Landfill
ECOENGINEERING – RM EAD
ELATSITE – MED AD
Detailed design for cleaning and repairs to the flood water canal starting from the Manastirsko gully.
Design of Primary Crushing building – PCB3 of the Elatsite Mine
ENEMONA AD
Erection (supply and installation of plant and equipment) for Gypsum Dewatering Plant for Units 1-6 of Maritsa East 2 TPP
Design, supply, installation and testing of wear-resistant fiber glass cinder-conveying pipelines – ContourGlobal Maritsa East 3
Replacement of cinder-conveying pipelines for ash and gypsum slurry – Lots 1&2 at the site of Enel Maritsa East 3 EAD
ZLATNA PANEGA CEMENT AD
Integrated engineering design for the development of Zlatna Panega quarry and Koritna quarry in the period 2017-2032 within the quarrying lease, and a comprehensive rehabilitation project.
Annual plans for the development of Zlatna panega and Koritna quarries and Annual Geological Report on the field reserves of Zlatna Panega and Koritna deposits.
CONTOURGLOBAL MARITSA EAST 3
Water Management System. Surge Water Storage Area.
FGD (Flue Gas Desulphurization) Plant– limestone conveyance.
Gypsum storage facility
MINI MARITSA IZTOK EAD
MINPROEKT has been the Chief Designer of the Maritsa Iztok Mines since the company was established, carrying out R&D and design works in the period 2014-2016 for advancing the mining front line, meeting the coal production targets, and the maintenance and reproduction of the production capacity of Mini Maritsa Iztok EAD – Radnevo, provision of field design supervision, technical assistance and participation in acceptance committees.
Advancing the mining front line in the period 2016-2021 at the Mines of Mini Maritsa Iztok EAD
Alternative options to get to the coal end eastern borders and opening up of the mining field during concurrently operated Troyanovo-1 & Troyanovo 3 Mines.
Main tubular belt conveyor (MTBC) 2 for ash and gypsum conveyance from MTBC 1 of Maritsa East 2 TPP to the United Northern Dump Areas of Mini Maritsa Iztok EAD
PIRIN -ORANOVO MINE
Mining plans for the driving of Haulage Slope 20 and Crosscut Tunnel 24, and Haulage Slope 22 and Crosscut Tunnel 25 in the Oranovo Mine
MARITSA EAST 2 TPP
Gypsum dump area for disposal of gypsum from the FGD (Flue Gas Desulphurization) Plants at TPP Maritsa East 2
Alternative options for feeding limestone to the storage facilities of Units 1-4, and feeding limestone to Units 5-6
Main Tubular Belt Conveyor (MTBC) 2 for ash and gypsum conveyance from MTBC 1 of Maritsa East 2 TPP to the United Northern Dumps of Mini Maritsa Iztok EAD.
TRANSGEO OOD
TRACE RESOURCES EOOD
FAM BULGARIA EOOD
Modernization of Sofia-Plovdiv Railway Line Project, Elin Pelin – Ihtiman Railway Section, technical and biological rehabilitation of disturbed lands and temporary facilities at the construction stage.
Project for mining and processing of underground resources under Art. 2, para 1 of the Underground Resources Act – metalliferous minerals – gold-bearing ores from Bresnik license area, Milin kamak deposit.
Design, engineering, supply and installation of a belt conveyor system at the limestone facility of the FGD (Flue Gas Desulphurization) Plant of ENEL Maritsa East 3.
STEINMÜLLER ENGINEERING GMBH
Design for the upgrade of Boiler 2 at ContourGlobal Maritsa East 3 TPP