Customers

Among the Minproekt’s customers are leading mining and energy companies, and mining consulting companies.

AMEC FOSTER WHEELER 

Krumovgrad Gold Project – design and supply of a process plant

Design of a pyrite recovery production line at Chelopech Mining EAD

Engineering and consulting services for the Krumovgrad Gold Project – Mining and Processing of Gold Ores from Ada Tepe Prospect of Khan Krum Deposit.

ASAREL-MEDET 

Life of Mine Plan and Annual Mining Plans for concurrent mining of the Asarel deposit and Asarel–West Section deposit – alternative options

Cyclic-Flow Line (CFL) 3 for ore crushing and conveying from the Asarel Mine to the Primary Crushing section of the Process Plant, with maximum use of the CFL 1 for overburden conveying, and a throughput of 3000 t/h

Conveying the clean waters of the Panova River by constructing protective canals and adjustment of the alignment of the potable water supply pipeline between the Panova River and the village of Obrochishte.

AURUBIS BULGARIA 

 Off-gases treatment plant

Enclosed conveyor belt system for concentrate

Concentrate loadout area

BULGARIA FLUORITE LTD.

BALGARSKA ENERGETIKA

BOBOV DOL COAL MINING LTD.

Detailed designs for the decommissioning of the Lukina Padina prospect and of the main openings at Ptichi Dol – Velin Dol prospect of the Lukina Padina deposit.

Detailed design for the technical and biological rehabilitation of industrial sites and dumps at Lukina Padina prospect.

Geological report on the remaining fluorite ore resources after the completion of the underground decommissioning of the Lukina Padina prospect.

Design, fabrication, supply, assembly and commissioning of SRs2000 & SRs200 Bucket Wheel Excavators at Mini Maritsa Iztok EAD.

Detailed design for the abandoning of the Babino mining area – underground section, and detailed desing for the abandoning of the Bobov Dol mining area – underground section, Bobovdol Coal Basin.

COAL PERNIK Ltd

ENGINEERING DOBERSEK GmbH

DUNDEE PRECIOUS METALS KRUMOVGRAD EAD

Annual Mining Plan for coal mining from the Bela Voda Mine

Upgrading of the Cooling Pumping Station (CPS-1) at Maritsa East 2 TPP

Engineering and consulting services for the Krumovgrad Gold Project – Mining and Processing of Gold Ores from Ada Tepe Prospect of Khan Krum Deposit

DUNDEE PRECIOUS METALS CHELOPECH EAD

Investigating logistics management and preparing a detailed design for a concentrate handling system for Area 18 – Concentrate Handling Project

Upgrade and expansion of the underground power supply system in the Chelopech Mine

Preliminary and detailed civil/structural design for repairs to the load-bearing structure of the Process Plant building.

AES

Preliminary and detailed civil/structural design for repairs to the load-bearing structure of the Process Plant building.

Desing for conveying and disposal of ash and gypsum from AES-3C Maritsa East 1 TPP. Industrial site; Infrastructure; Mining Waste Facility and transport

Dryanovo Ash and Gypsum Landfill

ECOENGINEERING – RM EAD

ELATSITE – MED AD

Detailed design for cleaning and repairs to the flood water canal starting from the Manastirsko gully.

Design of Primary Crushing building – PCB3 of the Elatsite Mine

ENEMONA AD

Erection (supply and installation of plant and equipment) for Gypsum Dewatering Plant for Units 1-6 of Maritsa East 2 TPP

Design, supply, installation and testing of wear-resistant fiber glass cinder-conveying pipelines – ContourGlobal Maritsa East 3

Replacement of cinder-conveying pipelines for ash and gypsum slurry – Lots 1&2 at the site of Enel Maritsa East 3 EAD

ZLATNA PANEGA CEMENT AD

Integrated engineering design for the development of Zlatna Panega quarry and Koritna quarry in the period 2017-2032 within the quarrying lease, and a comprehensive rehabilitation project.

Annual plans for the development of Zlatna panega and Koritna quarries and Annual Geological Report on the field reserves of Zlatna Panega and Koritna deposits.

CONTOURGLOBAL MARITSA EAST 3

Water Management System. Surge Water Storage Area.

FGD (Flue Gas Desulphurization) Plant– limestone conveyance.

Gypsum storage facility

MINI MARITSA IZTOK EAD 

MINPROEKT has been the Chief Designer of the Maritsa Iztok Mines since the company was established, carrying out R&D and design works in the period 2014-2016 for advancing the mining front line, meeting the coal production targets, and the maintenance and reproduction of the production capacity of Mini Maritsa Iztok EAD – Radnevo, provision of field design supervision, technical assistance and participation in acceptance committees.

Advancing the mining front line in the period 2016-2021 at the Mines of Mini Maritsa Iztok EAD

Alternative options to get to the coal end eastern borders and opening up of the mining field during concurrently operated Troyanovo-1 & Troyanovo 3 Mines.

Main tubular belt conveyor (MTBC) 2 for ash and gypsum conveyance from MTBC 1 of Maritsa East 2 TPP to the United Northern Dump Areas of Mini Maritsa Iztok EAD

PIRIN -ORANOVO MINE

Mining plans for the driving of Haulage Slope 20 and Crosscut Tunnel 24, and Haulage Slope 22 and Crosscut Tunnel 25 in the Oranovo Mine

MARITSA EAST 2 TPP

Gypsum dump area for disposal of gypsum from the FGD (Flue Gas Desulphurization) Plants at TPP Maritsa East 2

Alternative options for feeding limestone to the storage facilities of Units 1-4, and feeding limestone to Units 5-6

Main Tubular Belt Conveyor (MTBC) 2 for ash and gypsum conveyance from MTBC 1 of Maritsa East 2 TPP to the United Northern Dumps of Mini Maritsa Iztok EAD.

TRANSGEO OOD

TRACE RESOURCES EOOD

FAM BULGARIA EOOD

Modernization of Sofia-Plovdiv Railway Line Project, Elin Pelin – Ihtiman Railway Section, technical and biological rehabilitation of disturbed lands and temporary facilities at the construction stage.

Project for mining and processing of underground resources under Art. 2, para 1 of the Underground Resources Act – metalliferous minerals – gold-bearing ores from Bresnik license area, Milin kamak deposit.

Design, engineering, supply and installation of a belt conveyor system at the limestone facility of the FGD (Flue Gas Desulphurization) Plant of ENEL Maritsa East 3.

STEINMÜLLER ENGINEERING GMBH

Design for the upgrade of Boiler 2 at ContourGlobal Maritsa East 3 TPP