Mine Site Roads, Railway Lines and Routing of Linear Infrastructure
Projects

Cyclic-Flow Line (CFL) 3 for ore crushing and conveying from the Asarel Mine to the Primary Crushing section of the Process Plant, with maximum use of the CFL 1 for overburden conveying, and a throughput of 3000 t/h

Design of the railway line from the Knauf Plant to the existing railway line of ENEL Maritsa East 3

Main tubular belt conveyor (MTBC) 2 for ash and gypsum conveyance from MTBC 1 of Maritsa East 2 TPP to the United Northern Dump Areas of Mini Maritsa Iztok EAD